16 Sets of Large Factory Mechanical Equipment Entering and Leaving  the Bonded Zone
Case

16 Sets of Large Factory Mechanical Equipment Entering and Leaving the Bonded Zone

On December 27, 2024, we received a client's entrustment to arrange for the export of 16 sets of large equipment (such as compressors and charging machines), with a total of 232 tons of goods, into the Type B warehouse of our company's Changsha Jinxia Bonded Logistics Center. The gross weight of the largest single piece exceeded 40 tons, and it was also oversized in width and height. A total of 13 trucks were used for transportation, and the goods were unloaded in the bonded zone on December 27 and December 30 respectively.After being stored in the bonded zone for a period of time, in February 2025, we received a notice from the client. Due to the new requirements put forward by the foreign consignee for this batch of equipment, the current equipment could not meet the consignee's requirements for quality and specifications, so this batch of goods needed to be returned and imported back to the factory.

    During the handling of this batch of goods, the staff of H.F Bonded Logistics CO.,Ltd did not shy away from difficulties. They actively communicated with the client about the operation details and matters needing attention. According to the characteristics of the goods, they customized professional loading and unloading plans, and took measures such as placing cushion wood for the goods storage, preventing them from getting wet, and securing the rain cloth to prevent it from being blown away, ensuring the safety of loading and unloading, storage, and transportation. Even when there were anomalies such as a large difference between the actual weight of the goods and the theoretical weight provided by the client, and the customs' inspection due to being under surveillance during the customs declaration operation, the operation department of H.F Bonded Logistics CO.,Ltd calmly communicated with the client at any time, made timely adjustments, and had everything under control.

    Finally, all the goods were shipped out of the bonded zone within one day on February 28, 2025, as required by the client. Such a response speed has won unanimous praise from the client. 

    case
    case1
    case2
    case3
    case4
    case5
    case6
    case7